Bathymetric Survey to be Conducted for New WTP

As part of the ongoing development of the new Water Treatment Plant (WTP), engineering firm Monteith and Sutherland will be conducting a bathymetric survey of the Bay near the new WTP location. A bathymetric survey gathers water depth information, as well as the contours of the lake bed. The survey will inform the new WTP’s intake location and depth.

Posted in Post Archives and tagged , .